CONTAINER HOUSE AFTER FOLDING CONTAIENR HOUSE AFTER INSTALLTION
It is about 14.5sqm.It could be office or warehouse or toilet ,etc.The Electricity system has been installed in the container in the factory.
According to the customer's request, we can customize the container.combined movable house
combined movable house
Installtion (Please check the video)
It takes less than one hour for 2 persons to complete the installation.
1.Using the crane to lift up the roof panel ,the two short sides will be open.
2.Four steel column respectively insert into the four holes of the floor,and tighten the bolt in the bottom of the hole.
3.Put two pieces wall panels on backside, Install the middle steel column between thes two wall panels,then connect the top and the base bolts into the beam.
4.Put two pieces wall panels on front side, Install the middle steel column between thes two wall panels,then connect the top and the base bolts into the beam.
5.The container house complete installation
We have excellent management system and work teams,in terms of design,production, shipping, installation,communication etc .
We have experienced technology department,we devote in provide the best plan to our customer.
We have professional QC inspectors rigorously check every stage of production to ensure only qualified products reach our customers .We has passed SGS,BV,ISO quality testing system .
We have projects across the country, and extends business to over 30 countries in Western Europe,Southeast Asia,Africa and South America.
ODM service: Tell us your requests,we will design for you.
CDM service: Send us the design,we will work according to your drawings.
Transport service:Ex-factory,FOB,CIF and Door-to-Door,all OK with us.
Any other facility needed,we will arrange the collection.
STEEL STRUCTURE BUILDING
CONTAINER HOUSE
MODULAR HOUSE
STEEL SHEET
SANDWICH PANEL
ACCESSORIES
combined movable house